Request Power
Applicant [1]:
Must be the property owner/tenant
Required documents [2]:
If the applicant is the tenant, please also provide:
For non-residential use, please also provide:
Charges:
Subscribed demand | Deposit | Demand | |
---|---|---|---|
3.4kVA | MOP 65.00 | MOP 8.22 | |
6.9kVA | MOP 132.00 | MOP 18.80 | |
11.5kVA | MOP 219.00 | MOP 38.78 | |
13.8kVA | MOP 399.00 | MOP 46.53 | |
20.7kVA | MOP 598.00 | MOP 69.80 | |
34.5kVA | MOP 854.00 | MOP 116.33 |
Time elapsed:
Within four working days [10][11]
Remarks:
[1] If applicant cannot apply in person, he/she may sign an authorization letter to authorize a representative to apply on his/her behalf.
[2] If combined premises are involved, approved Modification Project Plan by the Land and Urban Construction Bureau (DSSCU) is required.
[3] BIR, HK ID, PRC ID or Passports of different countries.
[4] If the applicant is a company/association, copy of business/association registration issued within the latest 3 months is required. Moreover, the Electricity Supply Contract has to be signed by the legal representative(s) with company/ association chop.
[5] Copy of property transaction contract testimony by lawyer/Three-party contract/Housing Deed/Stamp duty (M1&M2) can be provided but is subject to approval.
[6] For lease with testimony by lawyer, ID copy of the owner is not required.
[7] The drawing should indicate the location of customer electrical installation and the meter. Further information may be required when necessary.
[8] Declaration has to be signed by the applicant or the legal representative(s) of the company/association with company/association chop. “Electrical Technician Declaration” is only applicable to Electricity Supply Application and Change of Subscribed Demand that require valid Electrical Installation License.
[9] For electrical installation under scope specified in Administrative Regulation no. 35/2011.
[10] Refers to free access to the electrical installation.
[11] Does not involve any customers or CEM engineering projects with payment of respective charges.
You may still want to know
Power Increase Evaluation
Don’t know the power supply situation of the property that you are going to buy or rent? Ask us to evaluate possibility for power increase and plan ahead.
Subscribed Demand (Meter Size)
How to select an appropriate subscribed demand? The subscribed demand of the supply contract should be selected by taking account of the power of all appliances that are intended to be used simultaneously. Try our demand calculator and select a suitable demand for your meter.
Electrical Works by Customer: Steps & Requirements
In the event that your existing electrical infrastructure does not support your application for New Supply or Increase of Power, you may need to hire a technician to perform electrical works on wiring and meter board / panel before CEM can install a meter.
Standard Condition of Supply of Electricity
By signing an electricity supply contract with us, both CEM and you are obliged to all the terms specified in the "Standard Conditions of Supply of Electricity" that are in force
Find an Electrical Technician
You may need a registered Electrical Technician for providing you technical support.