Supply Connection for New Building
Temporary supply
If you are considering a new construction project and your electricity plan has been approved by the government authorities, you may need temporary supply for your building project.
Documents to be presented:
Charges:
Time required:
Notes:
[1] Macau ID, HK ID, PRC ID or Passport of different countries.
[2] Connection charges are only applicable to Medium Voltage supply, and for increase of power demand (either in Medium Voltage or Low Voltage) for already installed temporary supply.
New building
If your project has been approved by the relevant government authorities, you can now approach us to plan the connection of the new building to the electricity supply network.
Documents to be presented:
Charges:
Time required:
Inspection of low voltage installation before energization:
Before the energization to a new building, contractor shall contact CEM to arrange an installation inspection with submitting the below document:
CEM will contact the contractor for onsite inspection upon receiving the above document.
Notes:
[1] Macau ID, HK ID, PRC ID or Passport of different countries.
Removal of electrical infrastructure
If you need to demolish a building or facility, contact us beforehand to remove the existing electrical infrastructure.
Documents to be presented:
Charges:
Applicants will be informed on the job costs incurred, if any. In accordance with the price list approved by MSAR.
Time required:
Depends on the nature and dimension of the job to be carried out by CEM. But in generally 20 days for Low Voltage/Public Lighting (IP) and 30 days for Medium Voltage after obtaining IACM license.
Notes:
[1] Macau ID, HK ID, PRC ID or Passport of different countries.